Everything a sunbed salon needs electrically, from the supply coming in from the street to the isolator next to each bed: three-phase power, how big a supply you need, breakers, RCDs, cables, isolators, controllers, paperwork and rough costs. With a free calculator to size your supply.
Quick answer
Most salons need a three-phase supply. A three-phase sunbed draws about 9 A to 32 A on each phase, so a 6-bed salon with every bed on can need 95 A per phase for the beds alone. Each bed gets its own circuit: a breaker and RCD as its manual says (often 3 × 16 A to 3 × 25 A, slow type), a correctly sized cable, and a lockable isolator in the room. All of it designed and certified by a qualified electrician.
Sunbed salon electrics: key facts
- Most commercial sunbeds run on a 400 V three-phase supply; a few smaller models also come in a 230 V single-phase version.
- A three-phase sunbed draws about 9 A to 32 A per phase at full power (beds of 6.3 to 22.1 kW). Current per phase = power ÷ 3 ÷ 230 V.
- Makers typically ask for a 3 × 16 A to 3 × 25 A slow-type (C or K curve) breaker for each three-phase bed, and a 30 mA RCD.
- Each bed needs its own circuit and a lockable all-pole isolator in its room, rated at least as high as its breaker.
- As an example, megaSun asks for a 5-core 4 mm² cable for its 15 kW 7800; the real size depends on the run and is set by the electrician.
- A standard UK supply goes up to 100 A per phase (about 69 kVA). 6 typical beds at full power need about 95 A per phase on their own.
- Upgrading a shop to three-phase typically costs £1,000 to £8,000 (estimate), more if the local network needs reinforcing, and takes about 6 to 8 weeks once the site is ready.
- The work must meet BS 7671 (18th Edition, Amendment 4 2026) and be certified with an Electrical Installation Certificate. Shops should have a periodic inspection (EICR) at least every 5 years.
What size electricity supply does a sunbed salon need?
Pick your beds and the rest of the shop. The calculator adds it all up, spreads it across the three phases and shows which common supply sizes it fits.
Your beds
Pick each bed, or choose Other bed and enter the power from its rating plate.
What supply you need
- Busiest phase
- 110 Aper phase, three-phase
- Everything on
- 74.4 kW323 A if it were all on one phase
With everything at full power at once, that's more than a standard 100 A per phase supply. Your electrician can work out the real maximum demand (beds don't always draw their full rating together). If it's still too much, you need a larger connection from your network operator, or fewer beds.
100 A per phase
Common supply sizes
| Three-phase | 60 A: Too small | 80 A: Too small | 100 A: Too small |
|---|---|---|---|
| Single-phase | 60 A: Too small | 80 A: Too small | 100 A: Too small |
Fits, with 20% spareTight: no room for moreToo small
Show what goes on each phase
- L1 110 A · 25.3 kW
- Bed 1: Ergoline Prestige 1600 (a third): 5.1 kW
- Bed 2: Hapro Luxura X7 42 SLi Intensive (a third): 3.3 kW
- Bed 3: megaSun 6800 alpha hurricane (a third): 3.3 kW
- Bed 4: Ergoline Affinity 700 Advanced Performance (a third): 4.0 kW
- Bed 5: Ergoline Sunrise 7200 (a third): 3.4 kW
- Bed 6: Hapro Luxura V6 42 XL Intensive (a third): 2.7 kW
- Air conditioning: 3.5 kW
- L2 108 A · 24.8 kW
- Bed 1: Ergoline Prestige 1600 (a third): 5.1 kW
- Bed 2: Hapro Luxura X7 42 SLi Intensive (a third): 3.3 kW
- Bed 3: megaSun 6800 alpha hurricane (a third): 3.3 kW
- Bed 4: Ergoline Affinity 700 Advanced Performance (a third): 4.0 kW
- Bed 5: Ergoline Sunrise 7200 (a third): 3.4 kW
- Bed 6: Hapro Luxura V6 42 XL Intensive (a third): 2.7 kW
- Water heater: 3.0 kW
- L3 106 A · 24.3 kW
- Bed 1: Ergoline Prestige 1600 (a third): 5.1 kW
- Bed 2: Hapro Luxura X7 42 SLi Intensive (a third): 3.3 kW
- Bed 3: megaSun 6800 alpha hurricane (a third): 3.3 kW
- Bed 4: Ergoline Affinity 700 Advanced Performance (a third): 4.0 kW
- Bed 5: Ergoline Sunrise 7200 (a third): 3.4 kW
- Bed 6: Hapro Luxura V6 42 XL Intensive (a third): 2.7 kW
- Lights, sockets and reception: 2.0 kW
- Extraction fans: 0.5 kW
Three-phase beds share their load across all three phases. Single-phase loads are placed, largest first, on the lightest phase. The busiest and quietest phases differ by 4 A.
A planning estimate, not a design. Your electrician works out the real maximum demand, and each bed's breaker, cable and isolator from its manual. How it works
How the calculator works
- Each bed's power is the maximum the maker publishes, the same figures as our sunbed electricity cost calculator.
- Three-phase beds are counted as an even load on all three phases: a third of their power on each.
- Single-phase loads (air conditioning, a water heater, lights and sockets, any single-phase bed) go on one phase each, largest first, onto whichever phase is lightest. That's how an electrician balances a board.
- Amps on each phase = its power in watts ÷ 230 V.
- The busiest phase is compared with common supply sizes. "Fits" means it uses no more than 80% of the supply, leaving room for uneven loads and another bed later.
It assumes everything runs at full power at once, which is the safe way to start. Your electrician works out the real maximum demand, and may find it's lower.
The example salon
The calculator starts with 6 beds (4 lie-downs and 2 stand-ups) totalling 65.4 kW, plus 9 kW for the rest of the shop. With everything on, that's 74.4 kW, or 110 A on the busiest phase. A standard supply goes up to 100 A per phase (about 69 kVA), so a salon like this needs its electrician to look closely at the real demand, or a larger connection.
Does a sunbed salon need three-phase power?
Most shops and homes have a single-phase supply: one live wire at 230 V. A three-phase supply has three live wires (called L1, L2 and L3), each at 230 V, with 400 V between them. It carries three times the power through cables of the same size.
Commercial sunbeds are almost all built for 400 V three-phase. A few smaller beds also come in a single-phase version, but they need a very large single-phase circuit (32 A to 50 A for one bed), so a single-phase shop runs out of room after one or two. If you're opening a salon with three or more beds, plan on three-phase.
How much power does a sunbed use?
Lie-down sunbeds in our list draw 6.3 to 22.1 kW at full power; stand-ups 7.9 to 11 kW. Built-in air conditioning, facial lamps and extras all add to it. For a three-phase bed, the current on each phase is its power ÷ 3 ÷ 230 V:
- A 12 kW bed: about 17 A per phase.
- The most powerful lie-down in our list (22.1 kW): about 32 A per phase.
- Six beds averaging 10.9 kW: about 95 A per phase.
The rest of the shop adds more: air conditioning to take the heat out of the bed rooms, extraction, a water heater, lights, sockets and the reception desk. The bed's rating plate, or the technical data in its manual, gives its power and the supply it needs.
How do you get a three-phase supply for a shop?
Three different organisations look after the electricity coming into your shop:
- The network operator (DNO) owns the cable from the street and the sealed cut-out with the main fuse. Only they can upgrade the supply. Find yours by postcode on the Energy Networks Association website.
- Your energy supplier owns the meter and the short cables from it (the meter tails), and changes the meter if the supply changes.
- Your electrician looks after everything from your main switch onwards: the board, the circuits and the beds.
To upgrade, apply to your network operator with the load you need (the calculator gives you the figures to start the conversation). They survey and quote. A standard supply goes up to 100 A per phase, about 69 kVA. More than that is a larger connection with a different meter arrangement. Lead times are typically 6 to 8 weeks once the site is ready, longer if the road has to be dug up.
Before you sign a lease, ask: is the supply single-phase or three-phase, what size is the main fuse, and is there a recent electrical inspection report? A shop that already has a good three-phase supply can save you thousands of pounds and weeks of waiting.
What goes between the meter and the beds?
After the meter comes a main switch to turn the whole shop off, then the distribution board (consumer unit) with a breaker for each circuit. A salon needs a three-phase board with enough ways for every bed plus the rest of the shop, and some spare. Your electrician will also check:
- Earthing. How the shop is earthed (the network operator's earth, or an earth rod at the property) affects how faults are cleared and what protection is needed.
- Surge protection. BS 7671 now expects surge protection devices in most new installations, including shops, to protect the installation from voltage spikes.
- Balancing the phases. Beds and other loads are spread across L1, L2 and L3 so that no one phase carries far more than the others. Three-phase beds share their load out themselves; single-phase loads are placed by the electrician. Tap Show what goes on each phase in the calculator to see an example.
How should each sunbed be wired?
Each bed gets its own dedicated circuit from the board. Ergoline's installation instructions, for example, ask for a separate supply line to each bed. That circuit is made of four parts.
What size and type of breaker does a sunbed need?
The breaker (MCB) protects the cable. Its size comes from the bed's manual: most three-phase beds ask for 3 × 16 A to 3 × 25 A. Makers also ask for a slow or delayed type (a C or K curve), because sunbed lamps draw a surge of current as they start. A fast type B breaker can trip every time the bed comes on.
Does a sunbed need an RCD, and what type?
An RCD switches the circuit off in a split second if current leaks to earth, for example through a person. Sunbed makers ask for 30 mA RCD protection: Luxura and megaSun in their technical data, and Ergoline recommends a 30 mA selective RCD with only one bed on each. A separate RCD (or a combined RCBO) for each bed means a fault on one bed doesn't plunge every room into darkness mid-session.
RCDs come in types: AC (only for plain AC currents), A (also pulsing DC), F (also high-frequency currents from motor drives) and B (also smooth DC). BS 7671 only allows type AC where the load is known not to produce DC currents, which modern beds with electronic ballasts, fans and drives may do. The type is your electrician's choice, from the bed's manual.
What size cable does a sunbed need?
The cable must carry the bed's current without overheating, and without the voltage dropping too far by the time it reaches the bed. Its size depends on the breaker, the length of the run, how it's fixed (clipped to a wall, in trunking, buried in insulation) and how many other cables it runs alongside. As an example, megaSun asks for a 5-core 4 mm² cable for its 15 kW 7800 (three lives, neutral and earth). A long run or a crowded route may need bigger.
Cables passing between rooms go through fire-stopped holes, and power cables are kept apart from control and data cables: Ergoline asks for at least 10 cm between them.
What isolator does a sunbed need?
Each bed room needs a switch that cuts the bed off completely, within easy reach and clearly marked. Ergoline calls for an all-pole isolating device on site, and Luxura's manual tells technicians to switch off "at the wall breaker (isolator)" before servicing. Typically that's a rotary isolator that:
- switches every live conductor, and the neutral where the manual asks (a 3-pole or 4-pole isolator);
- is rated at least as high as the bed's breaker;
- locks in the off position, so nobody can switch the bed on while lamps are being changed or the bed is opened up.
What do sunbed makers ask for?
Examples from makers' own published data. Always use the manual for your exact model and version.
| Sunbed | Power | Supply | Breaker |
|---|---|---|---|
| megaSun 7800Cable: 5-core 4 mm²KBL datasheet | 15 kW | 400 V three-phase | 3 × 25 A, slow (K-curve), with RCD |
| Ergoline Vitalityergoline.de | 12.5–13.1 kW | 400/415 V three-phase | 3 × 25 A, delayed |
| Ergoline Inspiration 500ergoline.de | 7.5 kW | 400 V three-phase | 3 × 20 A, slow |
| Hapro Luxura X7 38 SLiHapro manual | 6.3–10.4 kW | 400 V three-phase, or 230 V single-phase | 3 × 16 A (High Intensive 3 × 20 A); single-phase 1 × 32 A to 1 × 50 A |
| Hapro Luxura JewelLuxura brochure | 6.9–9.3 kW | 400 V three-phase | 3 × 16 A |
| megaSun K11 AirKBL brochures | up to 8.25 kW | 400 V three-phase, or single-phase | 3 × 25 A slow with RCD; single-phase 1 × 35 A with RCD |
How are sunbed timers and coin meters wired?
Most salons start and stop their beds from reception, with a controller or a coin or token meter for each bed. The controller doesn't carry the bed's full load. It switches the bed's own control circuit, or a pair of "volt-free" contacts on the bed, and the bed's contactor switches the power. So each bed needs:
- a control cable from the reception controller to the bed, kept apart from the power cables;
- a controller that suits the bed's control connection (check both manuals);
- a plan for where the controllers sit at reception and how the cables get there.
Salon software works alongside the controllers. TanEngine, for example, starts and stops sunbeds from the front desk and records every session, while the electrics stay exactly as your electrician installed them.
What else does each sunbed room need?
Nearly all of a sunbed's electricity ends up as heat in the room. A busy room gets hot quickly, and beds work best within the temperature range their maker gives. Plan for air conditioning or extraction for the bed rooms from the start: it's one of the larger loads after the beds, and it's far easier to run its supply during the fit-out. Add lighting, sockets for cleaning, emergency lighting and any fire alarm to the same plan.
What certificates, inspections and laws apply?
- BS 7671. All electrical work should meet BS 7671, the IET Wiring Regulations. The current version is the 18th Edition with Amendment 4 (2026).
- Electrical Installation Certificate (EIC). Your electrician gives you one for new circuits and new installations. Keep it: your insurer, landlord or the next buyer may ask for it. Smaller changes that don't add a circuit get a Minor Works certificate.
- Building regulations. In England and Wales, Part P covers homes, and shops that share a meter with a flat. A shop with its own meter isn't covered by Part P, but the work should still meet BS 7671. In Scotland, electrical work in any building, including shops, falls under the building standards and may need a building warrant. Northern Ireland has no Part P equivalent; BS 7671 is the standard.
- Periodic inspection (EICR). IET guidance recommends shops have one at least every 5 years, and when a new occupier takes over. A busy salon may be advised to have them more often.
- Your duty as an employer. The Electricity at Work Regulations 1989 require electrical systems to be maintained to prevent danger, so far as is reasonably practicable. Regular inspection, PAT testing of plug-in items and servicing beds as the maker says all help show you've done that.
- Sunbed laws. The Sunbeds (Regulation) Act 2010 (England and Wales), the Public Health etc. (Scotland) Act 2008 and the Sunbeds Act (Northern Ireland) 2011 cover who can use a sunbed, supervision and information, not the electrics. Some councils also have their own registration or licensing: check with yours.
How much do sunbed salon electrics cost?
Rough figures from published UK price guides. They're estimates, not quotes: get quotes from your network operator and electrician.
| Work | Typical cost |
|---|---|
| Upgrading to three-phase, or a bigger supply, from the network operatorTowards the low end where three-phase cable is nearby. Far more (one reported case: £15,000) if the local network needs reinforcing. Quoted by your network operator. Estimate | £1,000 to £8,000 |
| Three-phase distribution board, fitted and certifiedMore with surge protection, more ways or a separate board for the beds. Estimate | £1,000 to £1,800 |
| A circuit for each bed (breaker, RCD, cable, isolator)Mostly the length of the cable run and how it has to be fixed or hidden. Estimate | £200 to £500 or more per bed |
| ElectricianHigher in London. Estimate | about £50 an hour, £400 a day |
| Periodic inspection (EICR) for a small shopAbout 10% to 25% more in London. Estimate | £250 to £450 |
For a 6-bed fit-out with an existing three-phase supply, that's a board plus 6 bed circuits: very roughly £2,200 to £4,800 before air conditioning and controllers. If the supply needs upgrading, add the network operator's quote. To see how these costs fit into the whole business, try our sunbed salon profit calculator. Opening a new salon? Our guide to how to open a sunbed salon adds up everything it costs to open.
Sunbed salon electrics checklist
Print it and tick it off as you go.
Sunbed salon electrics checklist
From tanengine.app/articles/sunbed-salon-electrics-uk. A planning aid, not a substitute for a qualified electrician.
Sunbed salon electrics: common questions
Do sunbeds need a three-phase supply?
Most commercial sunbeds are built for 400 V three-phase power. A few smaller beds also come in a 230 V single-phase version, but a single-phase supply only has room for one or two of them. A salon with more than a couple of beds almost always needs three-phase.
How many amps does a sunbed use?
A three-phase bed spreads its load over three phases, so divide its power by 3 and by 230 V. A 12 kW bed draws about 17 A on each phase. Lie-down beds in our list (6.3 to 22.1 kW) draw about 9 A to 32 A per phase; stand-ups (7.9 to 11 kW) about 11 A to 16 A.
What size breaker does a sunbed need?
Whatever its manual says. As examples, makers ask for 3 × 16 A to 3 × 25 A for most three-phase beds, and a slow or delayed type (C or K curve) so the lamps starting up don't trip it. Single-phase versions need far more, 32 A to 50 A.
What size cable does a sunbed need?
Your electrician works it out from the breaker size, the length of the run, how the cable is fixed and what it runs alongside. As an example, megaSun asks for a 5-core 4 mm² cable for its 15 kW 7800. A longer run or cables bunched together can mean a bigger size.
What isolator does a sunbed need?
A switch in the bed room that cuts every live wire to the bed (an "all-pole" isolator), rated at least as high as the bed's breaker, and lockable in the off position so nobody can turn the bed on while it's being serviced. The bed's manual says what it needs.
Does a sunbed need an RCD?
Makers ask for one. Luxura and megaSun ask for a 30 mA RCD, and Ergoline recommends a 30 mA selective RCD with only one bed on each. A separate RCD or RCBO for each bed means one fault doesn't shut down every room. The type (A, F or B) comes from the bed's manual and your electrician.
How much does a three-phase supply cost for a shop?
Published estimates put upgrading to three-phase at about £1,000 to £8,000, near the low end where three-phase cable is close by. It can cost far more if the local network needs reinforcing. Your network operator gives the actual quote, and the work typically takes 6 to 8 weeks once the site is ready.
How often does a sunbed salon need an electrical inspection?
IET guidance recommends a periodic inspection (EICR) for shops at least every 5 years, and when a new occupier takes over. Your electrician may advise a shorter interval for a busy salon. Employers have a legal duty to keep electrical systems safe.
Can I wire a sunbed myself?
No. Sunbeds are large fixed loads on 400 V. The work must be designed, installed, tested and certified by a qualified electrician to BS 7671, and the bed must be installed as its manual says. Ask for an Electrical Installation Certificate when it's done.
Can I run sunbeds on a single-phase supply?
Only one or two smaller beds. A 100 A single-phase supply, used to 80%, has room for about 1.5 beds of 12 kW, with nothing else on. Check that the bed comes in a single-phase version: many don't.
Keep the salon running
Once the beds are in, TanEngine runs the rest from one screen on your salon PC: bookings, customers, courses, the till and starting the beds from the front desk.
Where the figures come from
Bed power ratings are the makers' published maximums. Breaker, RCD, isolator and cable examples are from makers' datasheets, brochures and manuals. Costs are from published UK price guides and are estimates. Checked November 2026.
Show every source
Rules and guidance
- IET: BS 7671:2018+A4:2026 published (15 April 2026)
- IET Wiring Matters: RCD protection of socket-outlets
- Hager: BS 7671 changes, surge protection and RCD types
- IET: inspection and testing FAQs (inspection intervals)
- Approved Document P (England): which premises it covers
- Scottish Building Standards, non-domestic: 4.5 Electrical safety
- Electricity at Work Regulations 1989, regulation 4
- SP Energy Networks: getting connected (who owns what)
- Electricity North West: connections FAQs (lead times)
- Energy Networks Association: who is my network operator?
- Ergoline Prestige and Sun Angel installation instructions
- I.D.E. e2.05 sunbed controller manual (how controllers switch beds)
- HSE INDG209: reducing health risks from UV tanning equipment
- Sunbeds (Regulation) Act 2010
Makers' data
- megaSun 7800: KBL datasheet
- Ergoline Vitality: ergoline.de
- Ergoline Inspiration 500: ergoline.de
- Hapro Luxura X7 38 SLi: Hapro manual
- Hapro Luxura Jewel: Luxura brochure
- megaSun K11 Air: KBL brochures
Costs
- National Grid Electricity Distribution: connections pricing guide
- MyJobQuote: is three-phase electricity more expensive?
- Homebuilding & Renovating: network upgrade costs
- Trade2Base: commercial electrical installation costs
- Trade2Base: dedicated circuit installation costs
- Checkatrade: electrician hourly rate
- Fergus: commercial EICR cost
- MyBuilder: EICR certificate cost
This page is general information to help you plan, not electrical advice or a design, and it isn't a substitute for a qualified electrician. Rules and prices change: check the current position with your electrician, network operator and council. Make and model names belong to their manufacturers; TanEngine isn't connected with or endorsed by any of them.